1
/
of
5
All-Over Print Men's Curved Hem Long Tank Top
All-Over Print Men's Curved Hem Long Tank Top
Regular price
€27,98 EUR
Regular price
€35,98 EUR
Sale price
€27,98 EUR
Taxes included.
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Can team the bodybuilding stringer with various sweat pants, jogging pants, compression pants, Jersey pants and bermuda shorts, etc.
- Fabric: Jersey(95% polyester and 5% spandex)
- Regular fit
- Sleeveless, curved hem, slightly longer back
- Fabric weight: 180g/m²
- Stitch Color: black or white, automatically matched based on patterns.
- Average Lead Time: 2-4 business days(The first month delivery of new products is about 7 business days)
- Care Instruction: machine wash cold with similar colors, do not bleach, tumble dry low, do not iron, do not dry clean.
- This product is made on demand, with no minimum order quantity.
- Multiple shipping methods available, and fees vary depending on the location and the shipping method selected.
- For custom areas, please refer to the Yoycol mockup generator for details.
- Notice: a variety of factors may cause slight differences between the actual product and the mock-up, including but not limited to colors and precision of elements position.
Size Guide
| Inch | S | M | L | XL | 2XL | 3XL | 4XL | 5XL |
| Front Length | 29.1 | 30.3 | 31.1 | 32.3 | 33.1 | 34.3 | 35.0 | 36.2 |
| Back Length | 31.1 | 32.3 | 33.1 | 34.3 | 35.0 | 36.2 | 37.0 | 38.2 |
| Shoulder | 11.4 | 11.8 | 12.2 | 12.6 | 13.0 | 13.4 | 13.8 | 14.2 |
| Bust | 33.1 | 37.0 | 40.9 | 44.9 | 48.8 | 52.8 | 56.7 | 60.6 |
| Centimeter | S | M | L | XL | 2XL | 3XL | 4XL | 5XL |
| Front Length | 74.0 | 77.0 | 79.0 | 82.0 | 84.0 | 87.0 | 89.0 | 92.0 |
| Back Length | 79.0 | 82.0 | 84.0 | 87.0 | 89.0 | 92.0 | 94.0 | 97.0 |
| Shoulder | 29.0 | 30.0 | 31.0 | 32.0 | 33.0 | 34.0 | 35.0 | 36.0 |
| Bust | 84.0 | 94.0 | 104.0 | 114.0 | 124.0 | 134.0 | 144.0 | 154.0 |
This size guide shows product measurements taken when products are laid flat. Actual product measurements may vary by up to 1".
EU representative: Europe Gateway International B.V., info@euegi.nl, Kraijenhoffstraat 137 A , Amsterdam, 1018RG, the Netherlands
